LHO General (SEI)
ryan.short@LIGO.ORG - posted 07:45, Monday 12 January 2026 (88735)
Ops Day Shift Start

TITLE: 01/12 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 8mph Gusts, 4mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.59 μm/s 
QUICK SUMMARY: JAC install and HAM7 alignment will continue today after craning finishes in the LVEA and it's transitioned back to laser hazard.

[Tagging SEI] The ETMX CPS glitched over the weekend, tripping both stages of the ISI, and I am unable to reset it without it tripping again immediately. Since ETMX isn't crucial for planned work today, I'll wait until Jim gets in and consult with him.