TITLE: 01/13 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Laser safe in the LVEA this morning for some craning and cabling, both in-chamber and out, but now back to laser HAZARD for more JAC installation and SQZ beam alignment this afternoon.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| ---- | SAF | HAZARD | LVEA | YES | LVEA is Laser HAZARD | Ongoing |
| 15:15 | FAC | Randy, Eric | LVEA | N | Craning | 16:45 |
| 15:58 | FAC | Kim, Nellie | LVEA | N | Garb & garbage | 16:28 |
| 16:14 | SAF | Richard | LVEA | N | Grabbing keys | 16:17 |
| 16:46 | FAC | Kim, Nellie | LVEA | N | Technical cleaning | 17:42 |
| 16:50 | CDS | Marc, Fil | LVEA | N | Checking panel placement | 18:06 |
| 16:51 | CAL | Tony | PCal Lab | Local | Start measurement | 17:42 |
| 16:59 | FAC | Randy | LVEA | N | Craning | 17:24 |
| 17:12 | VAC | Gerardo | EX | N | Troubleshoot ion pump | 17:37 |
| 17:28 | SQZ | Sheila, Jim | LVEA | N | HAM7 cabling | 19:24 |
| 17:34 | JAC | Jennie, Rahul | LVEA | N | JAC optics | 18:06 |
| 17:39 | PEM | RyanC | LVEA | N | Checking dust monitors | 18:18 |
| 18:06 | CDS | Fil, Marc | LVEA | N | Cable pulling input arm | 20:17 |
| 18:11 | JAC | Jennie, Rahul | LVEA | N | JAC optics | 19:11 |
| 18:28 | FAC | Randy | LVEA | N | Walkabout | 18:40 |
| 18:33 | PEM | RyanC | EY, EX | N | Checking dust monitors | 19:37 |
| 18:40 | FAC | Randy | EY | N | Dropping off equipment | 20:31 |
| 18:43 | FAC | Kim, Nellie | LVEA | N | Technical cleaning | 19:31 |
| 18:58 | FAC | Tyler | LVEA, MX, MY, EX, EY | N | 3IFO checks | 20:58 |
| 19:31 | FAC | Kim | MX | N | Technical cleaning | 20:04 |
| 19:35 | VAC | Gerardo | LVEA | N | Looking for parts | 19:48 |
| 19:58 | SQZ | Sheila, Jim | LVEA | N | HAM7 cabling | 20:29 |
| 20:37 | SAF | RyanC | LVEA | Y | Laser HAZARD transition | 20:53 |
| 21:04 | JAC | Jennie | LVEA | - | Turning on JAC HV | 21:07 |
| 21:09 | FAC | Richard, Tyler, contractors | LVEA | - | Electrical checks near HAM1 | 21:53 |
| 22:11 | VAC | Gerardo, Travis | EX | N | Replacing AIP controller | 23:00 |
| 22:14 | SQZ | Sheila | LVEA | Y | Turning on SQZ laser, opening viewport | 22:26 |
| 22:44 | JAC | Jennie, Masayuki, Rahul | LVEA | Y | JAC installation | Ongoing |
| 22:52 | CAL | Jeff | CER | - | Pictures of racks | 22:59 |
| 22:56 | SQZ | Sheila, Kar Meng | LVEA | Y | HAM7 SQZ beam alignment | 00:04 |
| 22:59 | CAL | Tony | PCal Lab | Local | Check measurement | 00:16 |
| 23:13 | JAC | Betsy | LVEA | Y | JAC installation | 00:13 |
| 23:34 | FAC | Tyler | LVEA | - | Checks | 23:40 |
| 23:51 | SQZ | Elenna | LVEA | Y | HAM7 SQZ beam alignment | 00:04 |