TITLE: 01/14 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Today's big activities: JAC alignment continues at HAM1. SUS model/daq work continues from Control Room and CER. HAM7 squeezer alignment continues.
LOG:
- 1545 sus model/daq begins with daq restart (jonathan/cds)
- 1810 CER (olli,jeff)
- 1828 CER for power supply rack install (marc)
- 2124 Oli left + Marc went out again to help with AntiAlias issue.
- 2228 Jeff confirms Marc's work was complete and CER work is done.
- 1556-1704 LVEA technical cleaning, checks, prep (kim.nellie)
- 1653-1937 Checking lasers and taking meeting in PCal Lab area (tony)
- 1713 nuc20 restarted for a new CDS Overview (dave)
- 1743-2337 Y-arm trailer moves to EY (randy)
- 1747 HAM1 JAC begins morning work(Masayuki)
- 1811 -1855 Rahul
- 1814-1842, 1934- Jennie
- 1913 Betsy running parts out
- 1845-1854 Parts search (travis)
- 1936-1942 Checking light fixture in LVEA (eric)
- 2017-0008 HAM7 alignment work continuing (sheila,karmeng)
- 2207 Sheila/Karmeng out for control room work
- 2309 Sheila/Karmeng back to HAM7
- 2119 JAC Alignment for afternoon (jennie,masayuki,keita)
- 2119 Gerardo joining to help with VAC/viewports
- 2155 Jennie out
- 2306 Jennie, Jason heading to HAM1
- 2336 Rahul out, 2359 Jason out
- 2150-2354 Switching integrating spheres in PCal lab (tony)
- 2200-2235 putting panels back on chasis in CER (dave)