TITLE: 01/15 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 9mph Gusts, 5mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.25 μm/s
QUICK SUMMARY:
JAC work continues with IOT2L being rolled up to HAM2 this morning for [IOT2 will be later today or Fri] alignment checks & IMC locking. Equipment moves in LVEA and from EY, and I believe there is more Squeezer alignment as well at HAM7.
Once again, Dust Monitor LAB2 has a "not a number" ERROR, all others OK/correct.