Locked BSC2 HEPI this afternoon so Randy and I could try to get the PEM accel plates of the south end of the support tubes. Plan was to try to crane the south end of the work platform, but the platform didn't like being picked up from just one end and it looked like it was going to swing into the crossbeam. We set the platform back down and just pulled all of the screws out of the PEM plates. Turned out there was just enough room to get the blocked screws out, if you used pliers or fingers to back them out. Plates are off, platform is moved back into position, I think Randy was going to put the braces back on.