Reports until 16:34, Friday 16 January 2026
H1 General
oli.patane@LIGO.ORG - posted 16:34, Friday 16 January 2026 (88792)
Ops Day Shift End

TITLE: 01/16 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Lots of work got done today. We are leaving the LVEA in LASER SAFE over the weekend
LOG:
To do items for today:
    DONE Finish alignment out IOT2L viewport
    DONE Move ZM4 to realign onto ZM5
    DONE Lift BSC2 platform and remove PEM gold plate
    DONE Roll up IOT2L to HAM2
    DONE Cable up IOT2L
    DONE Install bellows between HAM2 and IOT2L

Start Time System Name Location Lazer_Haz Task Time End
17:16 SAF HAZARD LVEA n LVEA is Laser HAZARD 21:19
15:46 FAC Randy LVEA YES Removing braces from BSC2 16:43
15:54 FAC Kim, Nellie LVEA YES Tech clean 17:03
16:15 JAC Masayuki LVEA YES JAC alignment 19:54
16:47   Corey LVEA YES Looking for bellows 16:17
17:02 JAC Jason LVEA YES JAC alignment 19:54
17:16 JAC Jennie LVEA YES JAC alignment 19:55
17:23 SQZ KarMeng LVEA YES HAM7 work 17:32
17:53 JAC Keita LVEA YES JAC alignment 19:06
18:37 CDS Jeff LVEA YES Moving cables around 19:16
18:43 SQZ Sheila, Rahul, KarMeng LVEA YES SQZ alignment (Rahul out 20:02) 21:03
20:48 FAC Randy LVEA n Moving IOT2L 22:18
20:49 FAC Marc, Corey LVEA n Moving IOT2L (Corey out 22:08) 22:32
20:50 LASER RyanC LVEA Y Transitioning to LASER SAFE 21:12
21:14 CHETA Matt, Sophie JOAT Lab n Poking optics 21:42
21:18 SEI Jim LVEA n Locking BSC2 HEPI 22:04
21:23 FAC Richard LVEA n Ruining weekends 21:30
22:35 FAC Tyler LVEA n   23:05
22:50 ISC Corey LVEA n Installing IOT2L bellows 23:43
22:58 PEM Robert LVEA n BSC2 investigation 00:58
23:23 SQZ Sheila, Robert LVEA n Grabbing a cable 00:08
23:27 CHETA Jennie JOAT Lab n Putting parts away 23:33
00:02   Tyler, tour LVEA n Tour 01:02
00:02 FIT Masayuki YARM n Running 00:30