Per WP12989 we completed the EOM cable install from PLS-R2 to the HAM-1 feedthrough. The old EOM cables from the PSL were disconnected at the patch panel, and the RF Combiner was powered down. RF Cables were landed at the patch panel from left to right, 24MHz, 118MHz, 45MHz, 9MHz, with 2 empty spigots on the right hand side of the panel located at U2 in the rack near the floor. We will shoot these with the TDR to once everything is installed to get total electrical length for calibration.
M. Pirello, F. Clara