Days Activities
-
Welding work continues at EY (practice welds and being filmed as well)
-
EX was transitioned to Laser Hazard for ALS work (Alexa/Sheila)
-
Kyle has begun pumping down at EX
-
H1 SUS HTTS was rebooted (Dave/Arnaud)
-
ITMx Oplev & electronics work (Thomas/Filiberto)
-
Cleanroom was moved from BSC2 -> HAM4 (this required GV2 to be closed/opened)
-
HAM4 HEPI electronics work (Hugh)
-
Had another SUS Watchdog INVALID alarm for everybody. Also get ALH Warning window saying there is a virtual circuit unresponsive context: cdsegw0.cds.ligo-wa.caltech.edu:33029
-
CP2 was filled (receiving overfill alarms)
-
Sheila gave another PSL Operator Training session in the Control Room