TITLE: 01/27 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 4mph Gusts, 3mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.33 μm/s
QUICK SUMMARY:
IFO is in IDLE due to PLANNED MAINTENANCE
Work continues on in-chamber JAC alignment and EOM work is continuing (RTP installation planned for today). Work is being done to close out HAM7.
Fire pump alarms bypassed for next 4 hours while churn testing is ongoing.