TITLE: 01/30 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 3mph Gusts, 1mph 3min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.40 μm/s
QUICK SUMMARY:
LVEA is LASER HAZARD with HAM1 & HAM7 still open for in chamber work.
Potential HAM7 work:
Tweak Alignment from cable Rubbing, OBO & TF
Potential HAM1 work:
Align Path out
IOT2L Beam profile measurement at 100 mW
Replace JM1/JM3 fixed mirrors with HTTS
Lock MC with HAM1 in air
Bifricate LVEA HAM1/South Bay/Work at Height all Laser Haz, rest of LVEA Laser Safe