Modulation depth measurement work has been completed for the day, so I have returned the PSL power in HAM1 to 0.1 mW and de-energized and locked out the PSL rotation stage. The PSL shutter has also been closed and locked out for the weekend.
We will need to revisit the modulation depth measurement on Monday, so I am leaving WP 13006 open and extending its date.