Reports until 11:26, Monday 02 February 2026
H1 SQZ
sheila.dwyer@LIGO.ORG - posted 11:26, Monday 02 February 2026 (88991)
RLF QPD segment3

As noted on Friday, RLF QPD A segment 3 railed Nov 29th, and has been railed since then.  

Filiberto, Kar Meng, Marc and I went to the rack and swapped the two cables for WFS1 + WFS2 on D2000552.  The saturaed segment moved with the cable which could indicate the problem is the in vacuum QPD.  

The 105kHz segment went quiet at the same time as the problem on the DC segment.  This happened on a Saturday, before the chamber was vented.  It had been two days of not locking the squeezer or the IFO before this happened.  

Edited to add:  This is the QPD used for filter cavity length control.  We did lock the filter cavity after the segment broke, December 4th.  

Images attached to this report