TITLE: 02/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Lots of work towards finishing up in HAM1 and HAM7, including some surfing! LVEA is still LASER SAFE except behind the curtasins by HAM1/2 and at height.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:49 | SAF | LVEA IS LASER SAFE | LVEA | NO* | LVEA IS LASER SAFE *BIFURCATED HAM1/2 bring ur LASER GOGGLES | 16:49 |
| 15:54 | FAC | Kim, Nellie | LVEA | Y/N | Tech clean (Nellie out 17:04) | 17:06 |
| 16:37 | FAC | Mitchell | LVEA | n | Grabbing stuff | 17:19 |
| 16:39 | FAC | Randy | LVEA | YES | Craning near BSC2 | 20:30 |
| 16:55 | PCAL | Dripta, Tony | EY | YES | PCAL measurements | 19:56 |
| 17:00 | FAC | Chris, pest control | LVEA | Y/N | Pest control | 16:30 |
| 17:01 | FAC | Chris, pest control | XARM, YARM | n | Pest control | 18:31 |
| 17:03 | FAC | Nellie | MY | n | Tech clean | 17:10 |
| 17:06 | VAC | Gerardo | LVEA | Y/N | Turning down purge air for HAM1 and HAM7 | 17:21 |
| 17:29 | FAC | Eric | EX | n | Chiller yard work | 18:07 |
| 17:41 | SPI | Jeff, Jim | OptLab | y(local) | SPI work | 21:03 |
| 17:54 | FAC | Kim | EX | n | Tech clean | 18:57 |
| 17:55 | FAC | Nellie | MY | n | Tech clean | 18:42 |
| 18:11 | VAC | Gerardo | LVEA | YES | Turning up purge air | 18:16 |
| 18:19 | JAC | Masayuki, Keita | LVEA | YES | JAC mode-matching | 20:07 |
| 18:31 | JAC | Jennie | LVEA | YES | JAC work | 20:07 |
| 18:31 | JAC | Jason, RyanS | LVEA | n | JAC table | 20:04 |
| 18:33 | FAC | Chris | Mids, Ends | n | FAMIS tasks | 20:22 |
| 18:41 | VAC | Gerardo | LVEA | n | Turning HAM7 purge air up | 18:51 |
| 19:04 | SUS | Rahul, Fil | LVEA | YES | Troubleshooting PM1 | 19:11 |
| 19:24 | Betsy | OptLab, LVEA | YES | Cleaning up JAC stuff | 20:30 | |
| 19:39 | FAC | Kim | LVEA | n | Putting away garb | 20:13 |
| 19:41 | VAC | Gerardo | LVEA | n | Turning on turbo pumps for FAMIS | 20:41 |
| 20:46 | PCAL | Tony, Dripta | EY | YES | PCAL measurements | 01:32 |
| 21:01 | SUS | Rahul | LVEA | YES | SUSing out PM1 | 23:05 |
| 21:06 | FAC | Randy | LVEA | YES | Moving forklift to HAM7 and being the ocean that carries the surfboard | 23:13 |
| 21:07 | Jennie | LVEA | YES | Helping move barriers for Randy | 21:24 | |
| 21:26 | Betsy | LVEA | n | Going out to help with surfing | 23:42 | |
| 21:27 | SQZ | Sheila | LVEA | n | Surfing | 23:56 |
| 21:28 | JAC | Keita, Jennie | LVEA | YES | JAC work (jennie out 23:13) | 15:08 |
| 21:35 | JAC | Jason, RyanS | LVEA | n | JAC table work | 01:37 |
| 21:35 | SEI | Jim | LVEA | n | Locking HAM7 ISI | 22:25 |
| 21:35 | Camilla | LVEA | n | Watching Sheila surf | 00:19 | |
| 21:59 | JAC | Masayuki | LVEA | YES | JAC work | 01:18 |
| 21:59 | VAC | Gerardo | LVEA | n | Turning off turbo pumps | 22:32 |
| 22:00 | FAC | Tyler | LVEA | n | Talking to Betsy | 22:14 |
| 22:33 | FAC | Chris | MY | n | Snorkel lift work | 23:05 |
| 22:33 | SPI | Jeff, Jim | OpticsLab | y(local) | SPI work | 23:48 |
| 22:34 | FAC | Chris | LVEA | n | FAMIS tasks | 21:49 |
| 22:58 | BHD | Elenna | OpticsLab | y(local) | Putting away optics | 23:14 |
| 23:21 | JAC | Jennie | LVEA | YES | JAC work | 01:37 |
| 23:27 | KarMeng | LVEA | n | Checking out HAM7 | 00:19 | |
| 23:29 | Travis | LVEA | n | Grabbing parts | 23:48 | |
| 23:42 | Betsy | LVEA | YES | Helping with JAC | 23:56 | |
| 00:35 | Camilla | LVEA | n | Getting laptop | 00:38 |