Reports until 16:31, Tuesday 10 February 2026
LHO General
corey.gray@LIGO.ORG - posted 16:31, Tuesday 10 February 2026 (89097)
Tues DAY Ops Summary

TITLE: 02/10 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

JAC team worked on two fronts (one group in the optics lab getting a set up for measurements for the eom crystal and the other to do alignment work in HAM1).  HAM7 continues the pumpdown.  There was a DAC upgrade for OAF0 (in the morning Dave [remotely] will need to finish one task here which should NOT require a DAQ restart). 
LOG: