TITLE: 02/10 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
JAC team worked on two fronts (one group in the optics lab getting a set up for measurements for the eom crystal and the other to do alignment work in HAM1). HAM7 continues the pumpdown. There was a DAC upgrade for OAF0 (in the morning Dave [remotely] will need to finish one task here which should NOT require a DAQ restart).
LOG:
- 1538-1919 "test-pitching" of BSC2 cleanroom tent (randy)
- Using West Crane for more lighting
- 1612-1728 LVEA technical cleaning (kim)
- 1622 Large bull elk spotted outside near route 10 next to the solar panel on the other side of the street from the LHO sign by Mitch. Dolly snapped some awesome photos of them (attached).
- 1634-1642 Checking on Annulus Ion Pump (jordan)
- 1656-1946 Restarting HAM7 pumping (gerardo, jordan)
- 1710-1730 PSL Power Supply for cameras (fil, marc)
- This did NOT take the laser down! :)
- 1715 OAF0 model up + daq restart around 11am (dave)
- 1715 Dave teamspeaked in about sound noise at EY---no one was out at EY (this came up via a signal on CDS Overview)
- 1726 BS ISI WD trip (most likely due to the "Tent" set-up). Re-isolated at 2014.
- JAC Team had meeting this morning & splitting into 2-teams (one looking at crystal in Optics lab and another working on locking the IMC)
- 1741 Looking at JAC eom crystal in optics (keita, jenne, betsy)
- 1858 elenna working with Keita (to spell jenne & betsy)
- 2002 Keita/Elenna out for lunch
- 1745-1800 Opening PSL light pipe in prep for JAC (sheila, jennie)
- 1745-2107 EX PCal measurements (tony, dripta)
- 1800 Richard out to chat with travis
- 1810-1908 EY technical cleaning (kim)
- 1813-1838 Parts search at optics lab & ham1/lvea (camilla, elenna)
- 1833 PCal team takes ETMx from MISALIGNED -> ALIGNED (dripta)
- 1834-2153 Warming up FARO for measurements at BSC2 (jason)
- 1910 Then Jason needs to help out at HAM1...and will return to FARO work
- 1909-2054 JAC team heading out to HAM1 (jennie, jason, oli)
- 1910-1950 OAF0 18bit to 20bit daq upgrade in CER. This will cause chillers to be down for 30min. Then power back up OAF0 computer in MSR. Then DAQ restart.
- 1940 Turned off TCS Chillers & turned back on at 1950 (camilla, corey)
- After DAQ restart, restarted ndscopes in the control room.
- 1924-2140 Checking on FARO warm-up (ryanc)
- 2026 heading back out to check on it
- 2034-2220 JAC crystal measurements continue (keita)
- 2121 Cable pulling around HAM3/6 (marc, fil)
- 2153 Set-up for SPI in the optics lab (jeff)
- 2307 Alignment work on HAM1 (jennie, oli)
- 2307 JAC crystal measurements (keita, elenna)
- 2352-0010 Checking on cable pulling (richard)