(Travis S., Jordan V., Gerardo M.)
Yesterday after inspecting the viewports on the +Y door, the pumpdown was started. The annulus was first, no issues with the pumpdown, pressure dropped nominally, indicates a good seal on the -Y door, then the main volume was blown down, dew point at -24.9 degrees C. Main volume was pumped for about 1 hour and 40 minutes, taking the pressure down to 33.4 Torr, then pumpdown was stopped for the night. We will continue with the pumpdown this morning.
Note, the cleanroom fans were turned off yesterday after the viewport inspection.