TITLE: 02/17 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 8mph Gusts, 5mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.39 μm/s
QUICK SUMMARY: The HAM1 JAC EOM will have some slight alignment adjustments made today before placing the JM1/3 suspensions in their proper positions. HAM7 continues to pump down.