TITLE: 02/23 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 16mph Gusts, 12mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.45 μm/s
QUICK SUMMARY: HAM1 work continues today after the purge air issue this weekend.