CHETA updates

S. Muusse, C. Compton, G. Vajente


We are still in the process of testing the CHETA electronics integration and have began fixing the optical setup on the ITMY Table to test the sensor in situ.
The optical system was realigned with the lenses, waveplate and polariser repositioned to ensure lower 4.65um intensity on the pickoff to prevent burning after the issues in post. All core optics for the 4.65um beam have been placed and we are in the process of adding the sensor paths and laser dumps. 

Electronics:
We tested all the laser diode and TEC controller ports on the chassis which were working. It is worth noting when connected to the Laser Enable control the diode will not turn on unless this is enabled and can be used to shut off the laser power.
The thermal power meter input was also working and power changes can be seen on ndscope
I've put in a table the status of all the CDS I/O we've tested so far:

Sensor Status Channel
Thermal Power Meter Voltage Operational  H1:AWC-ITM(OPTIC)_PD_C_VOLTS
Laser Enable Operational H1:AWC-ITM(OPTIC)_LASER_ENABLE
Laser current Operational H1:AWC-ITM(OPTIC)_LASER_DIODECURRENTMONITOR
Laser Temperature monitor Operational but uncalibrated H1:AWC-ITM(OPTIC)_LASER_DIODETEMPMONITOR
Flipper Operational but not installed H1:AWC-ITM(OPTIC)_FLIPPER_1
Rotation stage Not operational  H1:AWC-ITM(OPTIC)_POWER

Some notes are that:
PD_C is the thermal powermeter 
PD_A and PD_B are the PDs

We aim to installl the PD setup tomorrow and test its electronics. 