TITLE: 02/26 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: More HAM1 work done today, we're very close to closing
LOG:
Sophie will post log as comment
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:49 | SAF | LVEA is Laser SAFE | LVEA | NO* | LVEA is Laser SAFE *Bifurcated HAM1/2* | 17:19 |
| 15:40 | FAC | Randy | EY | n | Working on cleanrooms | 16:55 |
| 16:10 | VAC | Betsy | LVEA | YES | Turning purge air down | 16:14 |
| 16:10 | FAC | Kim, Nellie | LVEA | YES | Tech clean | 17:01 |
| 16:24 | Camilla | LVEA | YES | Transitioning to laser safe | 16:48 | |
| 16:33 | Betsy, Gabriele | LVEA | YES | Double checking and moving IOT1 | 16:47 | |
| 17:20 | JAC | Jason, Jennie | LVEA | n | Removing beam dump and viewport simulator | 18:05 |
| 17:20 | SEI | Jim | LVEA | n | SEI wiring and checks | 20:03 |
| 17:24 | FAC | Randy | LVEA | n | Moving scissor lift | 18:15 |
| 17:27 | SPI | Jeff, Josh | OpticsLab | y(local) | SPI work (Jeff out 18:00) | 22:10 |
| 17:32 | FAC | Nellie | HAM Shack | n | Tech clean | 17:54 |
| 17:32 | FAC | Kim | EX | n | Tech clean | 18:23 |
| 17:38 | EE | Fil | LVEA | n | Grounding loop checks | 19:54 |
| 17:48 | EE | Marc | LVEA | n | Grounding loop checks | 19:54 |
| 18:23 | FAC | Kim | MX | n | Tech clean | 18:56 |
| 18:24 | Betsy | LVEA | n | 18:33 | ||
| 18:45 | FAC | Randy | LVEA | n | Moving forklift | 19:13 |
| 18:56 | SPI | Jason | LVEA | YES | Grabbing lens in PSL anteroom for SPI | 19:13 |
| 19:19 | VAC | Jordan, Gerardo | LVEA | n | Checking out pump | 19:44 |
| 20:32 | FAC | Randy | LVEA | n | Scissor lift craning | 21:23 |
| 20:54 | EE | Fil, Jim, Marc | LVEA | n | Fixng PM1 grounding issue | 22:31 |
| 20:56 | FAC | Chris | LVEA | n | Grabbing bottle cart | 21:16 |
| 21:19 | BHD | Camilla, Elenna | OptLab | n | Opening OMCs | 22:32 |
| 21:20 | TCS | Sophie | JOAT Lab | y(local) | CHETA laser work | 00:28 |
| 21:23 | Betsy | LVEA | n | Helping out at HAM1 | 22:25 | |
| 21:34 | SPI | RyanS | OptLab | n | Inspecting optic | 22:09 |
| 21:39 | FAC | Randy | LVEA | n | Craning scissor lift | 22:13 |
| 21:51 | FAC | Jordan, Gerardo | LVEA | n | Helping with craning | 22:09 |
| 21:54 | TCS | Gabriele | JOAT Lab | y(local) | Helping with CHETA work | 23:32 |
| 21:58 | Richard | LVEA | n | Trying to catch someone doing something wrong | 22:09 | |
| 22:10 | SPI | Josh | OptLab | n | SPI work | 00:10 |
| 22:32 | SEI | Jim | LVEA | n | SEI checks | 00:02 |
| 22:40 | TCS | Camilla | JOAT Lab | y(local) | Helping with CHETA work | 00:27 |
| 22:42 | SUS | Betsy | LVEA | n | PM1 OSEM replacement | 23:03 |
| 23:04 | VAC | Travis, Jordan, Gerardo | LVEA | n | BSC8 pump work | 01:04 |