S. Muusse, C. Compton, G. Valente
Alignment of 4.65um beam on the ITMY was completed, excluding the QPD optics which require reflection off the ITM. I've attached a picture of the almost complete table with the notable optics modified today indicated. I'll get someone taller to add a better picture in the comments of the whole table.
Next steps:
The Medm screen is now in a workable form if not particularly finessed.The screen is called TCS_CHETA.adl and a shortcut was added for the X and Y arms by camilla to the TSC screen.
There is still work to be done here calibrating the powerdetectors and power meters.
note: currently power in for the rotation mount .adl is the laser diode current and should be changed to laser power when calibrated