Reports until 17:27, Wednesday 25 February 2026
H1 TCS
sophie.muusse@LIGO.ORG - posted 17:27, Wednesday 25 February 2026 - last comment - 07:38, Thursday 26 February 2026(89273)
CHETA Updates

S. Muusse, C. Compton, G. Valente


Alignment of 4.65um beam on the ITMY was completed, excluding the QPD optics which require reflection off the ITM. I've attached a picture of the almost complete table with the notable optics modified today indicated. I'll get someone taller to add a better picture in the comments of the whole table.

Next steps:


The Medm screen is now in a workable form if not particularly finessed.The screen is called TCS_CHETA.adl and a shortcut was added for the X and Y arms by camilla to the TSC screen.
There is still work to be done here calibrating the powerdetectors and power meters.
note: currently power in for the rotation mount .adl is the laser diode current and should be changed to laser power when calibrated

Images attached to this report
Comments related to this report
gabriele.vajente@LIGO.ORG - 07:38, Thursday 26 February 2026 (89278)

Small correction. The QPD path doesn't monitor the reflection from the ITM (there isn't any) but a pick-off of the beam right before it's launched into vacuum, by a beam splitter in the box that will be installed at the viewport.