Reports until 07:39, Friday 27 February 2026
LHO General
ryan.short@LIGO.ORG - posted 07:39, Friday 27 February 2026 (89297)
Ops Day Shift Start

TITLE: 02/27 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 4mph Gusts, 2mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.23 μm/s 
QUICK SUMMARY: One door and a viewport remain to be installed on HAM1.