TITLE: 03/03 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM1's main volume is pumping down nicely as of this morning. Cable pulling and parts cleanup also took place out in the LVEA.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:38 FAC Randy LVEA N Changing HAM1 cleanroom bolts 16:02
15:39 VAC Richard LVEA N Checking HAM1 annulus 15:41
15:53 FAC Kim, Nellie LVEA N Technical cleaning 17:30
16:55 EE Jackie LVEA N Pulling chassis from SUS-R7 17:02
16:55 VAC Travis LVEA N HAM1 pumpdown 19:30
17:22 FAC Nellie EY N Technical cleaning 18:07
17:37 FAC Kim EX N Technical cleaning 18:38
17:47 ISC Jennie, Masayuki LVEA N Parts cleanup at HAM6 18:42
17:57 VAC Gerardo LVEA N HAM1 pumpdown 19:31
18:11 ISC Elenna, Oli Optics Lab N BHD optics build (Elenna out @ 18:54) 19:59
18:51 SAF Richard LVEA N Checking on HAM1 19:10
20:35 SPI Jeff Opt Lab N Taking pictures 23:01
20:37 FAC Richard LVEA N Rebooting PSL environment controller 21:10
20:42 FAC Randy LVEA N Plugging in scissor lifts 21:15
20:46 ISC Elenna, Oli Opt Lab N BHD optics build 23:42
20:53 AOS Betsy LVEA N Putting away parts 21:18
21:24 ISC Jennie LVEA N Parts cleanup at HAM6 21:43
21:29 EE Fil, Marc LVEA N Pulling cables 21:39
21:30 ISC Camilla Opt Lab N Looking at parts 21:57
21:51 AOS Mitchell EX, EY N FAMIS checks 22:32
21:57 AOS Betsy Opt Lab N Checking parts 22:57
21:57 VAC Gerardo, Travis LVEA N HAM1 pumpdown Ongoing
22:39 EE Fil EY N Grabbing power supplies 23:38
22:44 SAF Richard LVEA N Looking for Travis 22:52
23:39 EE Marc, Fil LVEA N Pulling cables Ongoing
23:51 ISC Betsy, Jennie LVEA N Looking at parts at HAM6 00:05
00:06 ISC Elenna, Oli Opt Lab N BHD optics build Ongoing