TITLE: 03/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 13mph Gusts, 10mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.15 μm/s
QUICK SUMMARY:
HAM1 continues to pump down (6.4e-6torr). Brick deliveries to MY and other work for CEBEX have already started this morning. LVEA is laser SAFE.