Wed DAY Ops Summary

TITLE: 03/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

HAM1 continues to pump down, but we are getting closer to opening gate valves.  CEBEX work near MY had several truck loads of bricks (on pallets) put in lay-down areas.  Had a couple of tours on-site.  HAM1 ISCT1 & new small JAC in-air tables were rolled into place.