TITLE: 03/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
HAM1 continues to pump down, but we are getting closer to opening gate valves. CEBEX work near MY had several truck loads of bricks (on pallets) put in lay-down areas. Had a couple of tours on-site. HAM1 ISCT1 & new small JAC in-air tables were rolled into place.
LOG:
- ~1500 semi-trucks (brick deliveries) and contractor vehicle traffic begins for CEBEX
- 1539-1809 Walkaround lvea (rigging/garb room checks) and possible craning [randy]
- 1535-1641 LVEA technical cleaning (kim, nellie)
- 1641-1750 EX for supplies and cleaning (kim)
- 1845-1911 EY supply check (kim)
- 1535 SPI optics lab laser HAZARD work (jeff)
- 1707-1751 Surveying on backside of Y-arm for cebex (bubba.crew)
- 1712-1715 grabbing dustmonitor in cer (ryanC)
- 1750-1755 grabbing another dust monitor to test (RyanC)
- 1717-1800 lvea walkthrough (betsy)
- 1716-2350 CHETA cable pulling along x-beam manifold and around beer garden (marc.fil)
- 1720-1730 Isolating ham7 turbo pump (jordan)
- 1741-2356 HAM1 isi loops work off/on today (jim)
- 1757-1809 HAM1 Isolating Aux Carts on annulus (jordan)
- 1815 BSC1 ISI watchdog trips due to severe shaking around BSC1 (also around this time there was an EQ, but this did not affect any other chambers)
- 1820 SWWD bypassed by Dave to prevent DAQKILL of seib1 (alog 89355)
- 1835 Jim went out on the floor to see what was shaking the isi & sus
- 1850 Jim going out to check ISI coil drivers
- 1910 ISI back to isolated
- 1844 HAM1 leak detector set up (travis, jordan)
- 1902 Looking for Bellows for optics tables (camilla.betsy)
- 1906 2nd load of bricks on large truck arrives to offload at MY---these loads are out near the Chiller Yard
- 1944 load arrives on site and went to MY chiller yard
- 1917-1937 Ki-Be High School Tour in Control Room (maggie)
- 2043-2312 Forklift prep & ISCT1 + new JAC tables installation (randy)
- 2043-2101 TCS Chillers biweekly check/fill (corey)
- 2107 Beckhoff restart (daniel)
- 2111 ISCT1 rolled back into place (camilla,mitch,randy)
- 2127 BHD work in optics lab (elenna,oli)
- 2142 CEBEX brick truck leaving site (last one?)
- 2149-2233 lvea walkabout (richard)
- 2200-2212 CHETA lab to pick up a rotation stage for slow controls work (sophie)
- 2218 grabbing another one (sophie)
- 2311 returning rotation stages (sophie)
- 2207 checking on HAM1 work (jenne)
- 2207 putting stickers on the new little JAC table on the -y of HAM1 (travis)
- 2208-2312 heading out to HAM1 since -Y side is now clear of VAC equipment (jennie)
- 2226 Looking for VAC person in lvea for nitrogen air tank for BHD Top Gun work (elenna.oli)
- 2246-2312 Tour of WSU architecture students (RyanS)
- 2303 BHD work in optics lab (oli, elenna)
- 2356 MER power up sush7 io chassis (fil,marc)
- 2356-0026 Checking EX/EY wind fences (jim)
- 0001 JAC in-air table cable hook up (daniel)