TITLE: 03/05 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 10mph Gusts, 7mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.24 μm/s
QUICK SUMMARY:
HAM1 (@4.0e-6) & HAM7 (@2.6e-7) continue to pump down. There has been mention of opening gate valves (5 & 7), but not sure when. CEBEX contractors are out and continue to unload pallets of brick.