Summary
The JAC cavity was locked in vacuum for the first time. Alignment was performed using the JM1 suspension and PSL PZT scan. After lock acquisition, the demodulation phase was optimized and a new Guardian state (NORMALIZE_SIGNALS) was implemented to automatically normalize several signals based on a slow PZT sweep.
Details
First in-vacuum lock
Demodulation phase optimization
Guardian update: NORMALIZE_SIGNALS state
Normalization steps
1. JAC_REFL_A_RF43 input offset
The median value of JAC_REFL_A_RF43_I/Q_IN1 during the scan is taken as the offset
The negative value is applied as the input offset.
2. PDH error signal normalization
The peak-to-peak value of JAC-L_SERVO_IN1 during the scan is measured.
The signal is normalized so that the peak-to-peak becomes 1, by setting
REFL_A_RF43 filter gain = 1 / (max − min). The normalized signal is shown in the attached plot.
3. PZT scan trigger normalization
The peak photocurrent during the scan is measured.
This value is written to the Beckhoff channel JAC-TRANS_A_DC_NOMINAL to normalize the current signal.
4. Normalization report
A summary plot is automatically generated and saved as
/opt/rtcds/userapps/release/ioo/h1/medm/plots/normalize_report.png
You can open the plot from the button in the bottom-right of the MEDM screen