TITLE: 03/09 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
IMC was locked by sheila/camilla/ryanS. Checks on the BS & PR3 pointing were made. All is set for phasing work out on the floor tomorrow and then moving on to DRMI locking.
LOG: