TITLE: 03/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Busy day of IFO recovery, mostly in the form of hunting for beams and putting them in their appropriate places. See alogs from others for more detailed accounts of the day (such as alog89469). The wind has been picking up and doesn't look to be calming down until tomorrow, which has been making locking the arms difficult when desired.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:45 | FAC | Kim | Optics Lab | N | Technical cleaning | 14:55 |
| 15:09 | FAC | Kim, Nellie | LVEA | N | Technical cleaning | 15:56 |
| 16:42 | SEI | Jim | LVEA | N | Unlocking HAM1 HEPI | 16:53 |
| 17:04 | TCS | Sophie | Prep Lab | Local | CHETA work | 19:46 |
| 17:04 | Betsy | Optics Lab | Local | Looking at parts | 17:24 | |
| 18:08 | ISC | Oli | Optics Lab | - | BHSS work | 19:46 |
| 18:26 | SPI | Jeff | Optics Lab | Local | SPI characterization | 23:04 |
| 19:08 | ISC | Jennie | LVEA HAM1 | LOCAL | Take pictures by HAM1 | 19:13 |
| 20:53 | SEI | Jennie | Optics lab | LOCAL | SPI | 21:14 |
| 21:49 | CDS | Fil, Marc | LVEA | N | Looking at network cables in susrack | 22:07 |
| 22:56 | ISC | Daniel, Jenne, Jennie | LVEA | N | Checking power supplies | 23:39 |
| 23:02 | VAC | Gerardo | LVEA | N | Taking pictures of cryopumps | 23:25 |
| 23:06 | Camilla +1 | LVEA | N | Family tour | 23:29 | |
| 23:10 | TCS | Sophie | Prep Lab | Local | Collecting connectors | 23:50 |
| 23:25 | VAC | Gerardo | Mids, Ends | N | Looking at cryopumps | Ongoing |