TITLE: 03/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 8mph Gusts, 4mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.25 μm/s
QUICK SUMMARY:
Crew continues recovery work as I walked in: they were working on a pseudo-PRMI and then moved on to CHECK MICH FRINGES. And allof this was after work out on the floor at ISCT1 (see 89485). Much calmer breezes.
Operational Note:
What we can do alignment-wise with ALIGN IFO: Green Arms, PRX_LOCKED (for PRM touch ups). But basically have issues for any IR cavities alignment-wise that need WFS at this point. (Some MICH & SRC states also work, but we don't need them at this point)