Reports until 16:37, Thursday 12 March 2026
LHO General
corey.gray@LIGO.ORG - posted 16:37, Thursday 12 March 2026 (89488)
Thurs EVE Ops Transition

TITLE: 03/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 8mph Gusts, 4mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.25 μm/s 
QUICK SUMMARY:

Crew continues recovery work as I walked in:  they were working on a pseudo-PRMI and then moved on to CHECK MICH FRINGES.  And allof this was after work out on the floor at ISCT1 (see 89485).  Much calmer breezes.

Operational Note: 

What we can do alignment-wise with ALIGN IFO:  Green Arms, PRX_LOCKED (for PRM touch ups).  But basically have  issues for any IR cavities alignment-wise that need WFS at this point.  (Some MICH & SRC states also work, but we don't need them at this point)