Quad #2 work and weight measurements
Last week Quad # 2 was taken out of the test stand. Both structures (lower and upper) were placed in their corresponding containers. Quad # 3's  lower and upper structures are also in their storage containers.  These two quads (ETM and ITM) are ready for relocation to the LVEA for installation preparations. Some data were also collected by weighting the structures and these are the results:

Q2 Lower Structure --> 531 Lb
Q2 LS Storage Box --> 289 Lb
Q2 LS + Storage Box --> 820 Lb

Q2 Upper Structure --> 266.5 Lb
Q2 US Storage Box --> 147.5 Lb
Q2 US + Storage Box --> 414 Lb

The 2500 Lb crane scale was used for this work.

We were able to end the day by attaching the BS/FM on the test stand. I have attached some pictures corresponding to this task.