Reports until 16:10, Friday 13 March 2026
H1 General
ryan.crouch@LIGO.ORG - posted 16:10, Friday 13 March 2026 (89502)
OPS Friday EVE shift start

TITLE: 03/13 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 6mph Gusts, 4mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.21 μm/s 
QUICK SUMMARY: