ibrahim.abouelfettouh@LIGO.ORG - posted 07:43, Tuesday 17 March 2026 (89534)
OPS Day Shift Start

TITLE: 03/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 16mph Gusts, 10mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.29 μm/s 
QUICK SUMMARY:

IFO is in IDLE and ENGINEERING

Plan is to continue comissioning.

AS_B_RF_45 was rephased +90% yesterday and EVE OPS reports that this was not making things better. Thye tried both +-90% phase and reported that -90% worked better.