WP 13089
WP 13095
The following work was completed today:
- Beckhoff media converter placed on rack 24V power. Previously powered by bench power supply.
- TCSX 24V power and IR sensor cables replaced with appropriate length cables. Both TCS laser controllers for X&Y were keyed off. Power supplies output in MER disabled. This was done in precaution since the media converter work could disable TCS chillers. Laser controllers keyed on and power supplies output enabled when work was complete.
- Three HAM2 L4C cables pulled from SEI-C2 to HAM2. Jim W. sorting out final flange locations.
- Two 8 AWG power cables pulled from CER Mezzanine to SUS-R2.
- A DB37 cable was pulled from CER SUS-C2 to SUS-R1. Part of QOSEM upgrade.
Remaining work on SUS-R2 includes installation of power junction box, power sequencer, and a ±18V power strip.
F. Clara, J. Figueroa, M. Pirello and R. Thompson