Displaying report 1-1 of 1.
Reports until 07:40, Wednesday 18 March 2026
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:40, Wednesday 18 March 2026 (89548)
OPS Day Shift Start

TITLE: 03/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 29mph Gusts, 24mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.45 μm/s 
QUICK SUMMARY:

IFO is in IDLE and PLANNED ENGINEERING 

Plan today is to continue locking.

Displaying report 1-1 of 1.