WP 13101
Four DB25 cables were pulled from the HAM3 SUS-R2 rack down the Y-Arm. Cables around HAM3 are clear of any door removal activities. Cables reached the pylon on the Y arm. A second set of DB25 cables will be used to reach the mechanical test stand. These will be installed later, so as not to create a trip hazard or get damaged.
F. Clara, M. Pirello