Reports until 16:39, Wednesday 18 March 2026
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:39, Wednesday 18 March 2026 (89559)
OPS Day Shift Summary

TITLE: 03/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:

IFO is in a single bounce configuration

Overall calm day (though wind is on the rise).

The day started with an initial alignment that could help align the squeezer better. Steps taken were:

1. GREEN_ARMS_MANUAL - lock ALS - INITIAL_ALIGNMENT_OFFLOAD - ALSY was not showing up and trending told us BS was off so we adjusted it.

2. Went to MANUAL_INITIAL_ALIGNMENT

3. POWER to 10W. MICH_DARK_LOCKED (NO WFS). Adjust BS by hand to minimize AS_A

4. POWER to 2W, PRX_LOCKED, Adjust PRM to maximize AS_A

5. POWER to 10W, OFFLOAD_SR2_ALIGN - Fully auto

6. SRY_LOCKED, Adjust SRM by hand to maximize AS_A

7. POWER to 2W, AS_CENTERING_SINGLE_BOUNCE - Fully Auto. Ensure SRM, ITMX, PRM, ETMX, ETMY are misaligned (should do this on its own).

8. AS_CENTERING_OFFLOAD.

This is how to initially align.

Otherwise, SQZ work was the main task today - progress was made.

LOG:                                                                                                                                                                                                                                                                                                                                                                                                                        

Start Time System Name Location Lazer_Haz Task Time End
14:41 FAC Randy LVEA n Removing +X of BSC2 (Craning) 15:10
14:44 FAC Nellie, Kim LVEA N Technical Cleaning 15:47
16:06 FAC Nellie, Kim LVEA N Technical Cleaning 17:01
17:02 TCS Sophie Vac-Prep N CHETA 19:24
17:17 ISC Oli, Elenna Optics Lab Local BHD Work 19:31
17:30 SQZ Camilla Optics Lab, LVEA Local Grabbing optics 18:26
17:41 EE Fil MY N Look for cables at MY 18:41
18:13 VAC Gerardo, Camilla, Gabriele Optics Lab N Viewport inspection 19:31
18:26 PEM RyanC LVEA/CER N Checking dust monitors 18:36
18:28 SAF Richard LVEA N Checking curtains 18:36
18:52 SPI Jeff, Jim Optics Lab Local SPI work 22:00
19:42 OPS Ryan C CER N Dust monitor data 19:45
20:01 EE Fil LVEA N Cabling by biergarten 23:13
20:15 SQZ Sheila FCES N Recovering SQZ 22:04
21:06 BHD Elenna, Keita, Oli OptLab y(local) BHD work 23:54
21:21 TCS Camilla, Sophie LVEA N Marking stickers in prep 22:04
22:53 TCS Sophie Vac prep lab N CHETA work 23:16
23:15 VAC Gerardo Site buildings N Cryotrap checks around site 01:15