Displaying report 1-1 of 1.
Reports until 20:02, Wednesday 18 March 2026
H1 General
ryan.crouch@LIGO.ORG - posted 20:02, Wednesday 18 March 2026 (89560)
OPS Wednesday EVE shift sumary

TITLE: 03/19 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: I think the +90 phase is incorrect on RF45, and so is -90. I've been able to lock PRMI and DRMI easily this evening, but I lose it as soon as we engage DRMI_3F, more sensors to phase.
LOG:                                                                                                                                                                                                                                                                                                                

Start Time System Name Location Lazer_Haz Task Time End
22:53 TCS Sophie Vac prep lab N CHETA work 23:16
23:15 VAC Gerardo Site buildings N Cryotrap checks around site 00:39

 

Images attached to this report
Displaying report 1-1 of 1.