TITLE: 03/19 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: I think the +90 phase is incorrect on RF45, and so is -90. I've been able to lock PRMI and DRMI easily this evening, but I lose it as soon as we engage DRMI_3F, more sensors to phase.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:53 | TCS | Sophie | Vac prep lab | N | CHETA work | 23:16 |
| 23:15 | VAC | Gerardo | Site buildings | N | Cryotrap checks around site | 00:39 |