Displaying report 1-1 of 1.
Reports until 07:44, Thursday 19 March 2026
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:44, Thursday 19 March 2026 (89563)
OPS Day Shift Start

TITLE: 03/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 21mph Gusts, 18mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.21 μm/s 
QUICK SUMMARY:

IFO is in IDLE and ENGINEERING

Plan today is to continue locking. I will start with an initial alignment.

HAM3 ISI had tripped around, 4:30 UTC (9:30 PT) and was followed by 3 HAM3 CPS Glitches.

Displaying report 1-1 of 1.