TITLE: 03/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 21mph Gusts, 18mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.21 μm/s
QUICK SUMMARY:
IFO is in IDLE and ENGINEERING
Plan today is to continue locking. I will start with an initial alignment.
HAM3 ISI had tripped around, 4:30 UTC (9:30 PT) and was followed by 3 HAM3 CPS Glitches.