TITLE: 03/19 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 21mph Gusts, 16mph 3min avg
Primary useism: 0.14 μm/s
Secondary useism: 0.19 μm/s
QUICK SUMMARY: SQZ recovery continues into the evening with beam hunting at SQZT8; no calls for any IFO locking attempts before arm gate valves are closed in the morning. A M5.2 EQ is rolling through from the Caribbean.