TITLE: 03/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: n/a
SHIFT SUMMARY:
No Locking Today. There was some Squeezer alignment checks by sheila & tony. Gerardo & Jordan CLOSED GV5 & 7 as well as Filter Cavity mini-gate valves.
LOG:
- 1448-1520
Moving spreader bar over Y-Beam Manifold in West Bay in prep for cleanroom moves next week---canceled this since it was 510lbs. So Randy rolled a scissor lift into the lvea instead.
- 1450-1536 MY Technical cleaning (nellie)
- 1552 LVEA Technical cleaning (nellie)
- 1532-1550 Turning on laser for SPI work (jeffK)
- 1603-1615 grabbing laptop in CER (tony)
- 1642 HAM8 FCES work (sheila,tony)
- 1710 SPI optics (jeff,bram)
- 1943 lunch break
- 2057-2313 Afternoon work continues.
- Laser is OFF for the weekend
- 1756 Ion pump replacement @Y-beam manifold (gerardo,jordan)
- 1925 lunch break
- 2134 Afternoon work continues with checks of Ion Pump along YBM & then looking at an Ion pump on top of HAM1
- 1827 Pallet from Apollo for Jim received by Randy
- 2225 Starting to close GVs (5 & 7?)....then after coordinating with SQZ team (sheila,tony), VAC team will close GVs for Filter Cavity (gerardo,jordan)
- 22:40:17 GV5 Hard Closed (red on medm); Definitely heard this in the Control Room!
- 22:51:20 GV7 Soft Closed (yellow on medm); Did not hear this in the Control Room
- 2225 Tony grabbing IR viewer and then...
- 2230 Sheila joining and they will be looking at beams at ham shack
- 2226 EX grounding work 1hr(robert)