TITLE: 03/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Hard closing GV7 continues (no luck today). New platform craned into place between BSC2+3. Filter Cavity gate valves opened for more Squeezer alignment. Lots of cable/fibers pulled in the LVEA. Optics Lab was busy with Team SPI & Team BHSS work (as well as Team CHETA lab next door).
LOG:
- 1442 LVEA technical cleaning begins (kim, nellie)
- 1550-1630 break
- 1630 back out to LVEA (kim,nellie)
- 1712 nellie out
- 1749-1841 kim out, and then back in the lvea one more time from 1841-1916
- 1457-1507 Closing Filter Cavity GVs (total of 6) [jodan]
- 1503 Untripping Hardware Watchdog (jonathan)
- did not work but couldn't reset
- fil check wiring?
- may have to boot
- it got booted during Dec power outtage
- 1508 Prepping for "furniture moves" & craning: main work today is a new platform between BSC2 & 3 probably this morning (randy)
- 1525-1727 Norco LN2 @MX CP6
- 1540 SQZ bay clean-up & TCSy laser power ON (camilla)
- 1542 Getting big cable spool ready for cable pulling (fil, tony, randy)
- 1605 Cable pulling begins! (fil, tony, marc)
- HAM1 HAM2 taken to DAMPED
- 1842--break for lunch, most cables run. Dressing cables remains (marc)
- 1611-1742 Locking HEPIs: HAM3, BSC2, BSC3 (jim)
- Above chambers taken to DAMPED
- Betsy asked for HAM1+2 to be added as well!
- (If they are tripped, leave them that way since there is lots of activity out there anyway.)
- 1612-1632 PSL anteroom prep to cover hardware for HEPA fan replacement (jason)
- 1629-1858 BSC2/3 platform (randy.mitch)
- This concludes craning WITH a load. Platform still rigged to the crane as Randy gets ready to secure it in place. But now craning loads over the Filter Cavity Beam Tube is technically complete (Randy notifying Betsy)
- 1704-1728 Picking up battery charger part for scissor lift (chris)
- 1737-1920 Norco LN2 truck delivering to EX's CP8
- 1745-1929 BHSS laser hazard alignment in optics lab (elenna, oli)
- 1752-1836 ergo arm tests (ibrahim, ryanC)
- 1750-1811 Jenne tour in CR
- 1811-1904 Moving to LVEA with small group
- 1811-1828 Maggie Mt. Adams Middle School (8th grade) tour
- 1853-1912 transition FCES to safe (camilla)
- 1907-1920 Filter Cavity mini-gate valves closing (gerardo)
- 1931 Finish off cable pulling (fil, marc)
- Switching to SPI optical fiber
- disconnecting some cables from HAM1/2 in-air tables
- 1941-2135 Secure platform (& then disconnect off crane) [randy]
- 2003-2014 Quick cable check for BHSS (oli)
- 2005 Gathering up gas containers in lvea for GV7 (travis)
- 2103 Joining travis for GV7 work (gerardo)
- 2225-2259 joining VAC crew at GV7 (jordan)
- 2306 no luck on GV7's hard close (travis,gerardo)
- 2034-2047 Packaging up the ERGO Arm after earlier tests (ibrahim)
- 2037 SPI layout work (jeff,sina, bram)
- 2043 Optics Lab and LVEA walkabout (betsy)
- 2056 Tracter w/ Loader & back hoe heading to CEBEX site
- 2118-2239 Inventory C3 covers in Cleaning Room (ibrahim)
- 2128-2229 BHSS work (elenna,oli)
- 2210 CHETA table work (sophie)