jeffrey.kissel@LIGO.ORG - posted 13:02, Wednesday 25 March 2026 - last comment - 13:33, Wednesday 25 March 2026(89643)
PR3 Oplev Whitening Chassis Moved up in SUS-R2
J. Kissel, M. Pirello

While in SUS-R2 and thinking SPI, and looking at the proposed rack layout from G2401479, and accounting for all the SUS (BBSS, LO1, LO2) that's incoming for O5 -- I found that SPI can have a bit more space if we just move the SUS-PR3 optical lever whitening chassis up 5 U-heights from "32" to "27." I put the u-height in quotes because this is an old style rack with the u-heights labeled from top down, rather than the bottom up per industry convention. I would have and could have gone higher, but the 27 slot already had mounting clips in it, so I went there. We can go as high as "25" if need be in the future.

Pics of before vs. after are attached.
Images attached to this report
Comments related to this report
oli.patane@LIGO.ORG - 13:33, Wednesday 25 March 2026 (89644)

Adding more photos showing the whole rack so I can accurately update the cable wiring diagram