TITLE: 03/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: The +/- Y doors were taken off HAM1 this afternoon alog89672, See Jims' alog89673 for the current CS seismic configuration. I'm not sure if the intercom is working, I didn't hear myself after plugging it in and trying the offices. THe LVEA is now is LASER HAZARD, as is the optics lab.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:28 | FAC | Kim, Nellie | LVEA | N | Tech clean, Nellie out @ 15:12 | 15:19 |
| 14:58 | FAC | Randy | LVEA | N | Prep for door removal | 15:26 |
| 15:51 | VAC | Travis | LVEA | N | Check HAM1 purge air | 15:57 |
| 16:05 | FAC | Mitch | LVEA | N | Cleanup in the Wbay | 16:22 |
| 16:07 | EE | Fil, Marc | LVEA | N | Cable pulling for moving electronics, HAM3/BSC2 | 17:09 |
| 16:22 | VAC | Nellie | LVEA | N | Tech clean | 17:11 |
| 16:36 | VAC | Gerardo, Randy | LVEA | N | HAM1 door removal! Travis to join | 18:33 |
| 16:41 | FAC | Jason | Optics lab, LVEA | LOCAL/N | Property hunt | 17:21 |
| 16:50 | VAC | Betsy, Mitch, Travis | LVEA | N | HAM1 doors, Mitch Betsy out 1700 | 18:30 |
| 16:51 | FAC | Kim | LVEA | N | Tech clean | 17:44 |
| 17:02 | SEI | Jeff, Sina | Optics lab | LOCAL | SPI work | 18:07 |
| 17:03 | BHD | Oli | Optics lab | LOCAL | BHSS work, magnet pol checks | 20:16 |
| 17:12 | EE | Fil, Marc | MidY | N | Cable search | 19:53 |
| 17:32 | OPS | Ibrahim | Optics lab | N | Put away parts before curtains | 17:46 |
| 17:35 | FAC | Jason | PCAL lab | N | Property inventory | 17:39 |
| 17:38 | OPS | Betsy, Jim | LVEA | N | Cleanroom move by HAM1, Betsy out 1746 | 18:43 |
| 17:53 | EE | Thomas | Vac Prep | LOCAL | In-Vac cables | 19:19 |
| 18:32 | SUS | Ibrahim | Vac-Prep | LOCAL | Joining Thomas | 19:19 |
| 18:55 | BHD | Elenna, Keita | Optics lab | LOCAL | BHSS, Keita out 19:37 | 20:16 |
| 19:20 | SEI | Jim, Betsy | LVEA | N | LOCK HAM1 ISI | 20:07 |
| 19:43 | FAC | Randy | LVEA | N -> Y | Work on emod, handrails | 22:46 |
| 19:49 | SPI | Jeff, Sina, Jason | Optics lab/PSL encl | LOCAL | Measure fiber power, in lab checks then PSL enc checks, Jason out of PSL at 20:40 | 21:25 |
| 19:53 | EE | Fil, Marc | LVEA | N ->Y | Cables, all around HAM3 and BSC2 | 23:10 |
| 19:56 | SQZ | Sheila | LVEA | LOCAL | turn on SQZ laser, potential transition to hazard at SQZT7 | 20:06 |
| 20:11 | EE | Ibrahim, Thomas | Vac Prep | N | In-Vac cabling | 20:18 |
| 20:37 | EE | Ibrahim, Thomas, Sophie | Vac Prep | N | In-Vac cable making, Ibrahim 23:15 | Ongoing |
| 20:20 | ISC | Betsy | LVEA | N | Look into putting tables back | 21:39 |
| 20:48 | ISC | Sheila | LVEA | N | Talk to Fil and Marc, Turn on SQZ laser | 21:03 |
| 21:02 | TCS | Sophie | Vac prep | N | CHETA work | 22:56 |
| 21:22 | ISC | Betsy | Optics lab then LVEA | N | Parts/tools checks then LVEA | 21:56 |
| 21:22 | VAC | Travis, Bram | LVEA | N | Look at laser stop buttons | 21:27 |
| 21:24 | BHD | Elenna | Optics lab | LOCAL | Turn on the laser, cont BHD work | Ongoing |
| 21:31 | OPS | Sheila | LVEA | N -> Y | Laser Hazard transition | 21:47 |
| 21:58 | SQZ | Sheila | LVEA | Y | SQZT7 work, alignment | 22:15 |
| 21:59 | OPS | Jenne | LVEA | Y | Look for Fil/Marc | 22:14 |
| 22:06 | ISC | Keita, Jennie, Betsy | LVEA | Y | HAM1 work | Ongoing |
| 22:08 | SEI | Jeff | LVEA | N | Find part | 22:28 |
| 22:09 | ISC | Jason | LVEA | Y | Join HAM1 team | 22:21 |
| 22:38 | SQZ | Sheila | LVEA then FCES | Y | SQZT7 check before FCES | 23:06 |
| 23:21 | SQZ | Sheila | LVEA | Y | SQZ7 checks | Ongoing |
| 23:29 | SEI | Jim | LVEA | Y | Unlock HAM3 HEPI | Ongoing |