H1 SEI (OpsInfo)
jim.warner@LIGO.ORG - posted 13:13, Friday 27 March 2026 (89673)
SEI status for vent Mar 27

As of right now, HAM1-2-3 and BSC 2 & 3 HEPI are locked, and after doors came off HAM1 ISI is also locked. HEPIs are all bypassed in the model (by setting ISO master gain to 0). HAM1 should just be left tripped for the work in that chamber, HAM 2 &3 and the BSCs should be left with damping loops engaged, unless there is a need for better alignment to the IFO.