Displaying report 1-1 of 1.
Reports until 07:39, Monday 30 March 2026
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:39, Monday 30 March 2026 (89689)
OPS Day Shift Start

TITLE: 03/30 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 14mph Gusts, 10mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.13 μm/s 
QUICK SUMMARY:

IFO is in IDLE for PLANNED MAINTENANCE

An earthquake tripped some watchdogs - untripped now.

Plans this week prep BHSS and SPI in Optics lab and continue BSC2 platform install.

 

Displaying report 1-1 of 1.