TITLE: 04/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: The HAM1 work continues, ISCT1 was moved back into place.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:32 | FAC | Randy | LVEA | N | Prep for ISCT1 move, then help with HAM3 cleaning | 15:49 |
| 14:44 | FAC | Betsy | LVEA | N | Help Randy move table | 15:24 |
| 15:04 | FAC | Kim, Nellie | LVEA | N | Tech clean, HAM3 | 16:05 |
| 15:04 | SEI | Sina | Optics lab | LOCAL | SPI work | 17:07 |
| 15:25 | SEI | Jeff | Optics lab | LOCAL | SPI | 17:07 |
| 16:41 | ISC | Keita, Betsy | LVEA | LOCAL | ISCT1 work, Betsy out at 17:55 | 19:03 |
| 16:41 | FAC | Randy | LVEA | N | West bay work | 17:28 |
| 16:47 | FAC | Mitch | LVEA | N | Checks | 16:52 |
| 17:09 | SQZ | Camilla, Sheila | LVEA | LOCAL | SQZT work, LOCAL hazard | 17:49 |
| 17:18 | TCS | Sophie, Georgia | Prep lab | LOCAL | CHETA work | 18:54 |
| 17:25 | FAC | Tyler+Contractor | Optics lab, LVEA walls | N | Termite inspection/ sprays - ACME | 17:44 |
| 17:29 | CC | Oli | Optics lab | N | Talk to Tyler+contractor | 17:38 |
| 17:55 | ISC | Elenna | LVEA | LOCAL | HAM1 work | 19:03 |
| 17:57 | ISC | Jennie | LVEA | LOCAL | See if HAM1 crew needs help | 18:05 |
| 20:21 | EE | Fil | LVEA then CER | N | HAM6 electronics, then cabling in the CER | 23:04 |
| 21:49 | BHD | Oli | Optics lab | N | Magnet checks | 22:35 |
| 21:53 | ISC | Keita | LVEA | LOCAL | HAM1 work | Ongoing |
| 21:53 | FAC | Richard | LVEA / CER | N | Check on Fil | 22:03 |
| 21:54 | ISC | Betsy, Elenna | LVEA | LOCAL | Join HAM1 work | Ongoing |
| 22:02 | ISC | Camilla, Georgia | Optics lab | N | Look at mounts | 23:18 |
Keita, Betsy, and Elenna out at 00:00 UTC